Installation

A charger at your home or workplace, done properly

Most installation problems in Ahmedabad come down to two things: the building's existing wiring wasn't sized for a charger, and no one checked the load before installing. We check both before touching a wall.

Process

How it works

01

Site visit

We look at your parking spot, existing electrical panel, and distance to the meter — in person, not over the phone.

02

Load assessment

We check whether your existing connection can take the extra load, and what upgrade (if any) your DISCOM sanction needs.

03

Quote

A fixed quote covering the charger, wiring, protection devices, and labour — no surprise line items after the work starts.

04

Installation & commissioning

Certified electrician does the wiring and mounting; we test the unit end-to-end before we call the job done.

Pricing

Indicative packages

Final price depends on cable run length and whether your panel needs upgrading — the site visit tells us that. These are starting points, not final quotes.

Home · AC
₹[XX,XXX]
  • 3.3 kW AC charger
  • Up to 10m cable run
  • Basic panel check
  • 1-year service support
Get a quote
Home · Fast AC
₹[XX,XXX]
  • 7.4 kW AC charger
  • Up to 15m cable run
  • Load upgrade assessment
  • 1-year service support
Get a quote
Office / Society
Custom
  • Multi-point installation
  • DISCOM liaison for load sanction
  • Access/billing setup for shared use
  • AMC available
Talk to us
FAQ

Before you ask

Q

Do I need permission from my society or landlord?

Yes, for most apartment installations — we'll tell you exactly what to ask for after the site visit.

Q

How long does installation take?

Typically one day on-site once the quote is approved, assuming no panel upgrade is needed.

Q

Which car and charger brands do you support?

[Fill in — list the connector types and vehicle brands you actually service.]